top of page

Projects

with PEC Water

Transportation

dji_fly_20260210_101346_481_1770747350695_photo.jpg
Photo for Website_ Alignment Between 12th Street and SR99_7.16.23.jpg
P4- CAHSR Sustainibility.jpg

I-90 Creeks Fish Passage Project

Led the development of drainage design, erosion control plan, and stormwater management for the 5.5 miles of the new $90M Bus Rapid Transit (BRT) system.

SR167 Rebuild Interchange Project

Led hydraulic, stormwater, and pipeline engineering for the SR 167/North Meridian Diverging Diamond rebuild and expressway extension into Puyallup, WA.

CAHSR Sustainability Services

Led hydraulic, stormwater, and pipeline engineering for the SR 167/North Meridian Diverging Diamond rebuild and expressway extension into Puyallup, WA.

Flood Resilience

Basin C.jpg
Fournier Road Project Google Earth map.png
upstream end of pipe.jpg

BES Stormwater Risk Assessment

Led screening-level H&H modeling at three City locations to quantify flash flood risk under trash rack blockage scenarios using the USACE LSRI framework.

Fournier Road Improvement Project

Led hydraulics and hydrology for a new 50-foot bridge over Mariposa Creek, including HEC-RAS modeling, FEMA no-rise analysis, and bank protection design.

San Pablo Dam Road Culvert Replacement

Led hydraulic and hydrologic analysis for culvert repairs on San Pablo Dam Road, modeling a 400-acre watershed and evaluating nine proposed replacements.

Past Projects

Staff work prior to joining PEC Water

Green Infrastructure

Stormwater Rain Garden, Bioretention, Green Infrastructure
Large Scale Stormwater Capture Project, Green Infrastructure, Bay Area, South San Francisco, hydrailic and hydrology
Stormwater Management, Green Infrastructure, BMP, Caltrans, highway runoff

Eugene Bus Rapid Transit

Led the development of drainage design, erosion control plan, and stormwater management for the 5.5 miles of the new $90M Bus Rapid Transit (BRT) system.

Orange Memorial Park Stormwater Capture

Led the development of the division structure and conveyance system for the first large-scale stormwater capture system in the bay area.

Caltrans Stormwater Mitigation Design

Led the development of stormwater mitigation design for approximately 9 miles along state route 60. The project will capture runoff from over 53-acres of impervious area.

Pipeline Design, Condition Assessment, Rehabilitation

Groundwater recharge, pipeline design, Progressive Design Build
Large Diamter Pipeline Outfall Rehabilitation
Cured-in-Place-Pipe (CIPP) lining pipe bursting, pipe rehabilitation

Pure Water Soquel Pipeline

Our staff assisted with program management for the construction of a 9 miles pipeline through a progressive design-build contract.

San Jose Stormwater Outfall Rehabilitation

Our staff led the rehabilitation design of the severely deteriorated stormwater outfalls in highly sensitive areas throughout the city.

University Ave Pipeline Condition Assessment

Our staff led the inspection and evaluation of approximately 10,000 feet of 15- to 27-inch diameter pipeline.

Transportation

Rail stormwater management, bridges
bridges stormwater management BMP drainage, hydrailic and hydrology
tunnels and rails stormwater management program management

East Link Light Rail Segment A

Our staff assisted with the development of utility plans (storm, sewer, domestic water, fire service, and irrigation) for the 6.9-miles of the first-ever light rail over a floating bridge.

Shoup Bridge Replacement

Our staff led the development of the drainage, stormwater treatment, erosion and sediment control plan for this highly sensitive area project.

BART Extension to San Jose Phase II

Our staff assisted with program management of 5.5 miles of new rail extension and 4 new stations. This is the largest capital improvement project in the region.

Stormwater

stormwater management with green infrastructure manual
stream restoration hydraulic and hydrology modeling floodplain floodway
Molalla Stormwater Capture

LA County Green Infrastructure Manual

Our staff led the development of LA County green streets standard guidelines and details manual to meet the specific conditions, needs, and requirements of the county

Deadrun Stream Restoration

Our staff assisted with the restoration design of 4,700 feet of Dead Run stream. The project will prevent the loss of sediment and nutrients to the downstream water.

ODOT Molalla Roadway Expansion

Our staff led the development of the conveyance system, stormwater management design. The project provides a safe pedestrian path along the highway.

PEC Water Logo

Contact Us

562-333-0422

San Francisco (HQ)

1160 Battery Street East, Suite 100
San Francisco, CA 94111​

Oakland

66 Franklin Street Suite 300
Oakland, CA 94607​

  • LinkedIn

©2026 by PEC Water.

bottom of page